Specify the purchase duty
A trial order should close the gap between a selected laboratory sample and recurring consumption. Agree what the delivered material must prove, how long the process needs to respond and who may approve the result. A delivery deadline should not become the acceptance criterion.
Keep the wastewater source, supplied product identity and required separation result together. An application name narrows the enquiry but does not establish a universal grade or dose.
Connect the accepted sample to supply
Require the quotation and shipment to identify the proposed commercial code and its relationship to the sample. Agree required product and safety records, package options and lot identification.
Use the RFQ checklist to keep technical scope and commercial trial quantity distinct from routine demand.
Size a practical confirmation
Calculate quantity from the intended active-feed range, operating duration, preparation losses and usable equipment capacity. Define representative wastewater states and the sampling points.
Do not assume a universal number of bags or hours proves every clarifier, DAF or dewatering duty. Equipment inventory and process residence determine useful observation time.
Set release and recovery rules
Calibrate feeds and verify the reference condition before a controlled product or dose change. Define output limits, stop authority and a feasible route back to the incumbent. Record deviations and repeat where needed.
Routine orders should follow demonstrated performance within the specified range, not an informal report that the floc looked good during startup.
Read a conflicting trial result
If the plant trial changes wastewater load, coagulant and polymer simultaneously, the result cannot reliably qualify the new grade alone. Re-establish a controlled comparison before signing recurring supply approval.
Repeat the reference and leading conditions when differences are close to sampling or measurement variability. Keep untested conditions visible in the qualification rather than extending one favorable observation.
Agree the acceptance record
| Buying check | Evidence | Acceptance |
|---|---|---|
| Identity | Sample and production mapping | Same proposed material |
| Plan | Quantity, duration and sampling | Sufficient plant evidence |
| Authority | Stop, recovery and release rules | Controlled commitment |
Retain the coded sample, preparation, active basis and measurement timing. Preserve failed conditions alongside the accepted range so later deliveries can be compared with the actual evidence.
Request the relevant sample or offer
Send the sample approval, plant trial scope, equipment and demand forecast. Request a trial shipment matched to the confirmation plan with outstanding technical exceptions stated before dispatch.
Send the flocculant sample and quotation request and review product and supply requirements with Gongyi Xinqi Polymer Co., Ltd.. Confirm the offered identity, documents and commercial scope before ordering.

